Water, Gas & Wastewater Utility Standards

NOTE: The documents below, some of which reflect older standards, are being replaced by updated 2013 standard documents, which take precedence. All new documents will be uploaded by June 25, 2013. Until then, only the items preceeded by "2013" are current. Contact Engineeering at (650) 566-4504 if you are doing work and need copies of updated documents not yet posted here.

These standards govern the requirements for design and construction of all water, gas, and wastewater utility facilities within the City of Palo Alto. Private utilities on private property are under the jurisdiction of the City's Development Center's Building Inspection Division. All WGW utility projects within the City's public right of way (including gas services up to and encompassing the gas meter) shall conform to these standards and the Public Works Standard Drawings and Specifications unless otherwise approved in writing by the Water, Gas, Wastewater Engineering Manager.

These documents can also be purchased in book form at the Utilities Engineering Office located at 1007 Elwell Court, Palo Alto, CA 94303. Please call (650) 566-4504 for more information.

Water, Gas & Wastewater Specifications

Water, Gas & Wastewater Standard Details

Last Updated: Jun 14, 2013